Information Covid-19 - Health safety measures for construction activities

Print page

Contact details

Direction de la Prospective, de l'Urbanisme et de la Mobilité

23, Avenue Albert II

BP 609
MC 98013 - MONACO Cedex

Department of Forward Studies, Urban Planning and Mobility :
(+377) 98 98 22 99

Fax : (+377) 98 98 88 02

Opening Hours : from 08h30 to 12h00 and from 13h30 to 17h30 from Monday to Friday

Send us an email

Map

See on a map

Direction de la Prospective, de l'Urbanisme et de la Mobilité

23, Avenue Albert II

BP 609
MC 98013 - MONACO Cedex

Opening Hours : from 08h30 to 12h00 and from 13h30 to 17h30 from Monday to Friday

Phone : (+377) 98 98 22 99

Fax : (+377) 98 98 88 02

Send us an email
0

Applicable health safety measures

During the period of the COVID-19 Coronavirus epidemic, all those involved in building and public works activities are required to apply the health safety measures set out in the annex (amended version of 29 April 2020) to Ministerial Decree n° 2020-335 of 23 April 2020 setting out health safety measures for construction activities during the period of the COVID-19 Coronavirus epidemic :

Download file Annexe (version modifiée du 24 juin 2020) - Mesures de sécurité sanitaire pour les activités de la construction Annexe (version modifiée du 24 juin 2020) - Mesures de sécurité sanitaire pour les activités de la construction

Download file Fiche conseils - Mesures sanitaires générales sur les chantiers Fiche conseils - Mesures sanitaires générales sur les chantiers

Download file Fiche Conseils - Mesures sanitaires à mettre en oeuvre par les employeurs Fiche Conseils - Mesures sanitaires à mettre en oeuvre par les employeurs

Download file Fiche conseils - Port du masque 1 Fiche conseils - Port du masque 1

Download file Fiche conseils - Port du masque 2 Fiche conseils - Port du masque 2

Resumption or commencement of work

Before any work is resumed or undertaken, a file detailing all the measures proposed must be submitted to the Department of Forward Studies, Urban Planning and Mobility.

This file must be accompanied by the following documents:

  • An explanatory plan showing how the site accommodation is organised, specifying in particular the changing rooms occupied, the canteen seating, flows of movement to avoid contact, the positioning of water supply points, the distances, expressed in metres, between each changing room occupied, each seated place, between the tables themselves, etc.) 
  • A detailed list of all the personnel and their origin

 

It must be submitted by the project owner, in agreement with the companies involved.

Useful links

Last update: 08/06/2020

CONTACT WELCOME OFFICE
+377 98 98 98 98

or

click here

LATEST SITE UPDATES

Factsheets, sections, or press releases that have been added recently or updated.

See the latest site updates